This button is active only if the simulation execution has been paused in the midst of executing a unit procedure operation sequence (i.e. right before a unit operation).
Click on this button to resume the simulation (M&E Balances) and force the execution sequence to stop right after the end of the next operation in the current unit procedure’s sequence (if there’s one). If there is no other operation in the procedure sequence of operations, then the simulation will pause at the next available simulation stop location: either after automatic material push-out (if it applies) or upon exiting the unit procedure.
Shortcuts
Simulation Control Toolbar Button | ![]() |
Keys | F10 |
For more on the possible simulation stops inside a unit procedure, see Simulation Breakpoints.
For more on the functionality of all the buttons on the simulation control toolbar, see Simulation Control Toolbar.