Liquid Pressure Drop in a Gate Valve

General Description

This operation models the pressure drop of liquids flowing through a gate valve.

Unit Procedure Availability

      Liquid Pressure Drop in a Gate Valve Procedure

Liquid Pressure Drop in a Gate Valve: Modeling Calculations

Equipment Sizing

Given the flow rate through the valve and the pressure drop the required valve flow capacity (Cv) is calculated as:

ValveLiquidFlowCapacity.jpg 

eq. (A.358)

where:

      Q is the liquid flow rate (in gallons per minute, GPM),

      ΔP is the pressure drop (in psi), and

      SG is the specific gravity of medium (relative to water).

One Cv unit corresponds to 1 GPM of water (at 60 F, SG =1) flowing with pressure drop of 1 psi. Note that most manufacturers provide valve data (Cv vs. Diameter) in the American units system. The program does all appropriate conversions to display all variables in SI, except for the flow capacity, which is displayed in the above units (‘Cv’).

In Design Mode the user specifies the pressure drop and maximum diameter. A manufacturer chart, relating Cv and Diameter is used to calculate the diameter. If the calculated diameter exceeds the maximum specified, the program assumes multiple units operating in parallel with a total Flow Capacity (Cv) equal to the calculated.

In Rating Mode, the user specifies the diameter and number of units. The program uses the manufacturer’s chart to get the flow capacity and the resulting pressure drop.

IconInfo01251.bmp 

   As the Cv vs. Diameter data may vary from manufacturer to manufacturer, the user can use the calculated Flow Capacity (Cv) for obtaining the exact diameter from any manufacturer chart.

Liquid Pressure Drop in a Gate Valve: Interface

The interface of this operation has the following tabs:

      Oper. Cond’s, see Gate Valve: Oper. Conds Tab

      Labor, etc, see Operations Dialog: Labor etc. Tab

      Description, see Operations Dialog: Description Tab

      Batch Sheet, see Operations Dialog: Batch Sheet Tab

      Scheduling, see Operations Dialog: Scheduling Tab