Discrete Throughput Operations: Utilities Tab

ThroughputPowerD.jpg
Variable Definitions, Ranges and Default Values

The following table shows a brief description of the variables appearing in this tab. The table also displays their default values and their generally acceptable range:

Variable

Default Value

Range

 

Power Type
Indicates the power type that is used by the operation. Click on the list box to bring up a list of available power types in order to select one.

<Std Power>

Any Power Type

Specific Power (kW/(Entity/h)
The power consumed for the operation per flow of entities in the mixture.

0.0

Positive

Total Power (kW)
The total power consumed for the operation (per cycle).

0.0

Positive

Power Per Unit (kW)
The power consumed for the operation per equipment unit.

0.0

Positive

Power Dissipation to Heat (%)
The percentage of total power consumed for this operation that turns into heat, thereby raising the temperature of the material contained in the equipment.

0.0

[0,100]

Symbol Key: User-specified value (always input); Calculated value (always output); Sometimes input, sometimes output

Specification Choices / Comments

This dialog tab displays the calculated operating throughput of this operation. There is nothing to specify.

Duration Options...

The duration controls appear only if the procedure is in batch mode. In Rating Mode, you can set the process time (and the setup time), allow the process time to be calculated (based on the throughput), or allow the duration to match exactly the duration of another operation either in the same procedure or in another procedure. In Design mode, you must either specify the process time (and the setup time) or allow the duration to match exactly the duration of another operation (either in the same procedure or in another procedure).

If you choose to match the duration of this operation with the duration of another operation you introduce a master-slave relationship between the two operations. The program will match the setup-time, the process time and the turnaround time of this operation (the ‘slave’) with the corresponding times of the reference operation (the ‘master’ operation). For more on master-slave relationship, see The Scheduling Tab.