This property page is part of the dialog for editing the graph style of the equipment gantt chart (single or multiple batches).
The following list describes the available specification choices in this tab.
•Grid: Include Columns
Check the columns that you wish to see displayed on the grid view side of the interface.
•Chart / Grid: Include Summaries
The following is the full list of abstraction (summary) layers that can be present:
1. Operation
2. Cycle
3. Procedure
4. Section
5. Branch
6. Equipment
7. Batch
If you wish to omit any of the mentioned intermediate summary levels, then please uncheck the corresponding check boxes.
•Order / Include / Exclude Equipment
If you click on this button, you will be presented with the process-maintained equipment list. This is the list that is employed when displaying the equipment on the chart. If you modify the equipment order this will not only affect the equipment displayed on this chart but also in any other charts and/or tables where the custom order is followed (e.g. the equipment occupancy chart). The equipment order list can also be edited by selecting Include / Exclude / Order Equipment from the chart’s command menu or by selecting Preferences } Equipment Order from the flowsheet’s command menu.
•Grid Text Color / Font
With these controls you may set the desired text font style and color that appears in the grid.