The following table shows a brief description of the variables appearing in this tab. The table also displays their default values and their generally acceptable range:
Variable |
Default Value |
Range |
|
||
○ Port / Stream #1 |
<None> |
Any Output Port |
○ Port / Stream #2 |
<None> |
Any Output Port |
○ % to Stream #1 |
0.0 |
0-100 |
○ % to Stream #2 |
0.0 |
0-100 |
Symbol Key: ○ User-specified value (always input); ● Calculated value (always output); ◙ Sometimes input, sometimes output
The following list describes the available specification choices in this tab; for more details on how these are implemented, see Load and Split: Modeling Calculations.
If you want to remove some material as the simultaneously to the loading operation you can do this by specifying up to two output streams (port 1 / port 2).
For each component present in the process you can specify the percentage of its amount in the equipment that is to be removed via ports 1 & 2. The sum of the components percentage in these two streams cannot exceed 100.